o Drilling Projects

aamco drilling projects Details And Gallery

1.AAMCO Services Successfully completed Auguring Drilling for Boreholes & Installation of Anode with scope to drill 46 wells.(HEISCO Co.)

2.AAMCO Services Successfully completed KOC Feed Pipelines For New Refinery Project Drilling for 12”± Dia. Bare and Coasted Steel Casing For 3 wells Each Well 70m depth.(ALGHANIM CO.)

3.AAMCO Services Successfully completed Drilling of Borehole for Cathodic Protection system inside KOC with scope to drill 2 wells each well 70m depth.(BITCO Co.)

4.AAMCO Services Got opportunity to be a part of Kuwait Al-Najat Charity to drill water wells in India and African countries.

Auguring Work and Site Inspection Site Inspection Site Inspection Site Inspection Final look after Drilling and Casing After Completion of CP works Anode Installation Works for Alghanim Project and LFHO Project Work Anode Installation Works for Alghanim Project and LFHO Project Work Anode Installation Works for Alghanim Project and LFHO Project Work Anode Installation Works for Alghanim Project and LFHO Project Work Anode Installation Works for Alghanim Project and LFHO Project Work Casing Work Casing Work Pvc Pipes Casing. Welding joints of casing Casing 12mts length Drilling operations at night time. Drilling pipe works at site. Drilling works. cleaning by drilling team before starting drilling work Drilling Drilling Our Highly trained drilling team Drilling operations in night time.d After completion of drilling and casing Oil Well site visit by operation manager while anode installation for alghanim Giving work instruction by the safety team Pipes for Drillin Man Rig Bentonite for drilling. Drilling Generator Drilling Equipment Rubber Based Adhesive and sealents Tata Rig Clearence certificate from KOC. Drilling Home Drilling Roads Drilling Roads Drilling Equipments Drilling Bit Drilling Bit Rig Soil Testing Soil Testing Casing Casing Welding Casing Pipe Casing Drilling Casing Casing Casing Anode Installation Drilling Drilling operations at night After completion of drilling well look with junction box Mud tanks while drilling. Drilling Work Drilling Water circulation with mud tanks while drilling